Preparation before relocation:
1. Showing hotel furniture should take protective measures in advance to ensure that the items that handle are not damaged, the items are uniformly marked and placed, and protective anti -theft measures are taken.
2. The work should ensure that the designated time of the relocation should be completed and debugged. At the same time, we should do a good job of protecting theft and anti -theft measures for equipment storage rooms.
3. Preparation of related relocation objects: marking pen, sealing glue, carton, screwdriver, hammer, pliers, tablet, colorful cloth, old ground felt, etc.
4. Protective laying on the main channel of the handling of the transportation of the carrier to ensure that the handling items are not damaged. The unified pair of furniture supplies that need to be relocated are uniformly numbered and marked, and the results of the office point are based on the comprehensive management room.
5. The public areas are arranged and numbered in accordance with the pre -set functions, and indicated on the scene and drawings. Once the number is confirmed, the television, cabinets, beds, sofas, stools, cooked tables, tables, tableware, etc. will also be used uniformly to ensure that it can quickly and accurately find the destination of each item. The relocation of furniture supplies is quickly and effective.
6. After the relocating personnel, after get off work, seal the furniture that need to be relocated to avoid the loosening of the furniture due to the loosening of parts and drawers during the transportation process. And keep the key number and properly.
Precautions:
1. The label must be accurate and detailed. Each item should be labeled to be accurate when moving into the stacking land.
2. Fragmented and afraid of pressing items. After the box is packed, the special label is affixed to distinguish the general items. Go to the place of stacking to check and plan the placement of large items. Furniture handling should be shined lightly and cannot be dragged on the ground.
3. The coordination problem at the scene was implemented by the person in charge of the relocation team and the coordinator of the relocation coordinator. The relocated personnel only reflected the person in charge of the relocation group for the right of the relocation group for their superiors and opinions. The project is responsible for negotiating with the owner.
Safety measures:
1. At the construction site, you must wear a helmet, tie the jaw belt, prohibit smoking, and prohibit the operation after alcohol. Bare feet, bare chest, red back, and slippers enter the scene.
2. Construction workers on the floor prohibited from throwing items, raising materials and garbage.
3. Forbidden to move, demolish and modify safety protection facilities, warnings, warnings, and prompt signs.
4. Non -electrocomputer prohibits the use of power distribution lines and facilities.
5. Do not stay in the building, prohibit exterior personnel from staying.
6. Hold a class before -to -work every day.
7. Packing furniture supplies must be neatly placed in accordance with regulations and identified.
8. It is strictly forbidden to burn garbage on the spot to prevent fire and air pollution.